Injection Pump Installation Method:

The Counteract Balancing Beads Injector Pump is assembled from quality tested manufacturer approved equipment, however safety goggles must be worn while using this high air pressure tool.
1. Make sure that both valve handles are in the closed position (90% angle from the brass valves)
2. For safety measures the metal guard has been permanently affixed to the plastic bowl container. To load the desired amount of Counteract Balancing Beads, remove the container by pulling down on the black slider with the red lock guide and turning approximately half inch to either side. Pull container in a downward motion away from the blue housing.
3. Fill container with desired amount of packaged Counteract Balancing Beads.
4. Reattach container to blue housing by pushing together and turning left or right until the black slider with red lock guide snaps into place.
5. Place blue housing down with container on top enabling beads to enter housing chamber.
6. Make sure that your valve handles are still in the closed position. Install airline coupling to CBB injector pump.
7. Remove valve core from tire to be balanced and let air pressure drop to approximately half the specified P.S.I. Attach the clip-on air chuck to tire valve stem ensuring that it is fastened securely.
8. Turn valve handle to open position on air inlet side first and then turn valve handle on outlet side allowing CBB micro beads to be injected into the tire. This injection should take approximately 10 to 15 seconds. Allow an additional 10 seconds to make sure that the line is clear before closing both valves and removing air chuck from tire valve stem.
9. Reinstall the valve core and inflate tire to specified P.S.I.
10. Before next installation open outlet valves to remove any air pressure remaining in container. Make sure that rubber seal inside the blue housing is free of any left over particles. This will ensure easy opening and closing of container. It is also recommended that the rubber seal be lubricated periodically.